Restoring and protection of wetland habitats and ecological landscapes in Sundarban

January 2025 to March 2028

Funded By: Axis Bank Limited
Project Duration: January 2025 to March 2028
Project site:
  • Sahapur village, Beraberia Gram Panchayat, Amdanga Block, North 24 Parganas
  • Lakshmipur village, Madhusudanpur Gram Panchayat, Kakdwip Block, South 24
    Parganas
  • Buraburir Tat and Dakshin Surendraganj village, G Plot Gram Panchayat, Patharpratima block, South 24 Parganas
    Short details:
    • Wetland Habitat Restoration
      • 1.3 ha of wetlands and riverine systems in Bhagirathi Hooghly-Padma estuary.
      • Renaturation/ afforestation of 119 ha of mangrove habitat in Indian Sundarban through nature-based solutions.
    • Protection of mangrove ecological landscape by strengthening 2.5 km of sand dunes
      shielding 3.2 km of embankments.